Technical Review Committee (Langdon Services/Infrastructure)

WHAT IS IT?

The Technical Review Committee (TRC)  was approved by RVC Council in May 2025.  The TRC is to study and determine the efficient expansion of servicing/infrastructure for Langdon and surrounding area:

Map of the study area for Langdon Servicing - TRC project
Map of the study area for Langdon Servicing – TRC project

Langdon Waterworks will be commissioning four technical studies for the study area, which pertains to the following utility/servicing infrastructure: potable water, sanitary sewer, transportation, and storm water systems. Langdon Waterworks will be responsible for keeping the representatives up to date on progress or findings of the studies.

 

WHO IS ON IT:

TRC:

  • Langdon Waterworks – 2 representatives
  • Ducks Unlimited – 1 representative
  • Western Irrigation District (WID) – 1 representative
  • Rocky View County – 2 representatives
  • General Public – 2 members

VISION COMMITTEE:

 

TIME LINE:

Q2 2025 – Program Initiation (TRC established) – Terms of Reference

Q3 2025 – Community Visioning (Vision Committee established, public engagement, committee report)

Q4 2025 – Draft ASP amendment (Draft policy/map amendments based on Infrastructure Report, Land Use Strategy, Public Review)

Q1 2026 – Bylaw Adoption (Public Hearing)

 

More Articles & Posts

error: Content is protected !!